Friday, 3 March 2017

Another deadline approaches

Before Christmas last year, The Committee decreed that Camford Junction should have all the scenic track laid and some trains running in time to show it on the club stand at the Basingstoke exhibition in March (11th and 12th). It may look like we left everything until two weeks before the deadline, but things have been happening behind the scenes. The gang have built all the points and track, assembled the Dingo servo mounts and prepared 2mm Scale Association under-baseboard tiebars. Actual track laying was delayed by the problems with the baseboard joins (which are now resolved) and by me turning the baseboards upside down to wire up the main line tracks. But now, track laying is proceeding rapidly:

This board will have the last three points laid this week. The troughing for the carriage washer has been installed beneath the concrete sleepered track, and etched drain grills added, although they are barely visible.




The left hand board is being sculpted to fit the inspection pits for the loco shed. These were salvaged from the previous layout, 70K Coley Park.



Latest update, trains are now running the full length of the layout, and some temporary cosmetic arches have been added (to be replaced by properly modelled ones later) and more buffer stops are appearing:




1 comment:

haleighagaebel said...

JTVU Sportsbook in Muhleburg, SC | 860 704-8639 | KCTVU
JTVU 공주 출장마사지 Sportsbook in Muhleburg, 김제 출장샵 SC | 860 704-8639 | KCTVU Sportsbook in 진주 출장안마 Muhleburg, SC 포천 출장안마 | 860 704-8639 | KCTVU Sportsbook in Muhleburg, 속초 출장샵